Signs include frequent tripping, flickering lights, old fuse boxes, discoloured sockets, or wiring older than 25–30 years. An EICR inspection can confirm whether a rewire is needed.
A full rewire typically takes 5–10 days depending on the size of the property, though partial rewires are much quicker.
For a full rewire, it's often more practical to stay elsewhere temporarily, though this depends on the property. We'll discuss the best approach with you beforehand.
There will be some disruption, such as lifting flooring or chasing walls, but we work carefully to minimise mess and keep you informed throughout.
NG Power Solutions © 2026. All rights reserved. Website Developed by Ismail H Hridoy